The 24” line had suffered from external corrosion. This resulted in several through wall defects along the butt weld near the flange
24″ Cooling Water Line

The 24” line had suffered from external corrosion. This resulted in several through wall defects along the butt weld near the flange
During normal operating conditions a seawater leak was identified on the seawater supply line.
The 4”x6” GRP Tee had suffered from a crack resulting in a through wall pin hole leak.
The 8” line had suffered from internal corrosion/erosion. This resulted in a through wall leaking defect close to the valve flange assembly at the 4 o’clock position
The 6” Tee with 4” branch had suffered from external corrosion close to the Tee.
The 20” line had suffered from internal erosion. This resulted in through wall defects on the flange.
The 8” steam header had suffered from internal erosion causing a through wall defect.
The water tank had suffered from possible internal acid corrosion.
The 30” Crude oil line had suffered from (CUI) external corrosion.
The 48” Cooling Water line had suffered from external and internal corrosion.