24HR Urgent response
24 Hour Emergency response: 0800 121 7777
  • Home
  • About Us
  • Meet the Team
  • Repair and Protect
    • Pipeline Repair
    • Live Leak Sealing
    • Structural Repair
    • Corrosion Protection
    • Vessel Repair
  • Case Histories
    • Case Histories Composite Repairs
    • Case Histories Clamp Repairs
  • Technical
  • Contact
  • Home
  • About Us
  • Meet the Team
  • Repair and Protect
    • Pipeline Repair
    • Live Leak Sealing
    • Structural Repair
    • Corrosion Protection
    • Vessel Repair
  • Case Histories
    • Case Histories Composite Repairs
    • Case Histories Clamp Repairs
  • Technical
  • Contact

Author Archives: ohcreative

24″ Cooling Water Line

The 24” line had suffered from external corrosion. This resulted in several through wall defects along the butt weld near the flange

Posted byohcreativeNovember 12, 2024November 13, 2024Posted inLeak Repair, Repairs to Tees, elbows and flanges

20” leaking Seawater filter line

During normal operating conditions a seawater leak was identified on the seawater supply line.

Posted byohcreativeNovember 12, 2024November 12, 2024Posted inCaisson Leak Repair, Pipe integrity, Repairs to large diameter pipelines, Repairs to Tees, elbows and flanges

4″ To 6″ Seawater Tee

The 4”x6” GRP Tee had suffered from a crack resulting in a through wall pin hole leak.

Posted byohcreativeSeptember 2, 2024November 13, 2024Posted inLeak Repair, Pipe integrity

8″ Produced Water Line Leak (Crude Oil Cooler & M.P Seperator)

The 8” line had suffered from internal corrosion/erosion. This resulted in a through wall leaking defect close to the valve flange assembly at the 4 o’clock position

Posted byohcreativeSeptember 2, 2024November 13, 2024Posted inLeak Repair

6 Inch Hydrogen Line

The 6” Tee with 4” branch had suffered from external corrosion close to the Tee.

Posted byohcreativeSeptember 2, 2024June 17, 2025Posted inPipe integrity

20″ Inlet Pipework to seawater

The 20” line had suffered from internal erosion. This resulted in through wall defects on the flange.

Posted byohcreativeSeptember 2, 2024November 13, 2024Posted inLeak Repair, Pipe integrity

8″ Steam Header

The 8” steam header had suffered from internal erosion causing a through wall defect.

Posted byohcreativeSeptember 1, 2022November 13, 2024Posted inPipe integrity, Repairs to large diameter pipelines

Water Seal on outside of Flare Vessel

The water tank had suffered from possible internal acid corrosion.

Posted byohcreativeSeptember 1, 2022November 13, 2024Posted inLeak Repair, Repairs to large diameter pipelines, Vessel Repair

24″ & 30″ Crude Oil Line Leak

The 30” Crude oil line had suffered from (CUI) external corrosion.

Posted byohcreativeSeptember 1, 2022November 13, 2024Posted inLeak Repair, Pipe integrity, Repairs to large diameter pipelines

48″ Sea Water Line

The 48” Cooling Water line had suffered from external and internal corrosion.

Posted byohcreativeOctober 17, 2019November 13, 2024Posted inLeak Repair, Pipe integrity, Repairs to large diameter pipelines

Posts pagination

Newer posts 1 … 5 6 7 8 9 Older posts
Linkedin Twitter
  • 0800 121 7777
  • METALYTE PIPEWORKS LTD
    Unit M Riverside Industrial Estate Atherstone Street Fazeley Tamworth Staffordshire B78 3RW
  • COMPANY NUMBER: 08126595
    Registered in the UK

© All rights reserved

legal

  • Privacy Policy
  • Cookies Policy
  • How to Opt Out
  • Terms & Conditions
VIEW OUR ISO9001 CERTIFICATION
VIEW OUR ISO14001 CERTIFICATION
VIEW OUR QUALITY POLICY
Website by OH Creative