
35 Inch Flare Line
The 35” line had suffered internal corrosion, resulting in a through-wall defect.
ASME PCC 2 ISO TS 24817 Compliant composite repair solution to restore lines to full operational capability.
We cover both onshore (refineries, chemical, power) and offshore (platforms, FPSOs, subsea).
Our team work to the highest standards of health and safety and ensure that once integrity work is completed, sites are left clean, clear and safe.

The 35” line had suffered internal corrosion, resulting in a through-wall defect.

Internal corrosion caused a through wall steam leak on a 10” elbow.

