The tanks suffered corrosion under insulation (CUI) on the vertical shell
16 Patch Repairs

The tanks suffered corrosion under insulation (CUI) on the vertical shell
Client required a composite repair to seal the leak locations live to prevent an unplanned shutdown.
The 1” Y Strainer had suffered from a leak
The 1” Strainer had suffered from a leak
The 1/2” valve had suffered a leak from the gland
The 4” line had suffered from external corrosion
The 48” line had suffered from internal corrosion.
The 12” line had suffered from internal wall loss.
The 10.75” OD carbon steel Flare line was found to have severe external atmospheric corrosion.
The 2 x 4” elbows had suffered from internal erosion.