Four 54 inch Water Pump Composite Live
Four 54 inch Sulzer raw water pumps had developed multiple through-wall leaks
ASME PCC 2 ISO TS 24817 Compliant composite repair solution to restore lines to full operational capability.
We cover both onshore (refineries, chemical, power) and offshore (platforms, FPSOs, subsea).
Our team work to the highest standards of health and safety and ensure that once integrity work is completed, sites are left clean, clear and safe.

Four 54 inch Sulzer raw water pumps had developed multiple through-wall leaks

The 20 inch and 24 inch lines had suffered from excessive external corrosion and potential internal wall loss on the 24 inch concrete lines

Several different size conductors had suffered from external corrosion between (+10m) above sea level and (-5m) below sea level

The 16 inch hydrocarbon pipeline had suffered from extensive external corrosion