MP Case History

31 Composite Repairs to Crude Lines

Multiple sections of external corrosion were identified across five crude oil lines

Defect Description

Multiple sections of external corrosion were identified across five crude oil lines, reducing wall thickness significantly (up to 83% loss in some areas). In total, 31 separate repair locations were required to restore integrity.

Repair Method

Metalyte Pipeworks designed and executed a composite repair program in accordance with ISO 24817:

    Surface preparation by shot blasting to SA2.5.
    Defects faired with Herculyte epoxy resins to restore line geometry.
    Application of Dragon Q-STD composite system, 4–6 layers depending on defect severity.
    Curing controlled with heater blankets and monitored to ensure correct hardness and
    temperature.
    Repairs finished with UV- and chemical-resistant epoxy coating for long-term protection.

Outcome

    31 repairs were successfully completed across 16”–36” crude oil lines.
    Repairs achieved a 20-year design life.
    Lines were restored to full operating integrity without the need for replacement.
    Full QA/QC documentation was provided, including hardness testing, temperature records, and
    repair ID tagging.