MP Case History

0.5 inch Steam Valve

The 1/2” valve had suffered a leak from the gland

NATURE OF DEFECT

The 1/2” valve had suffered a leak from the gland and the client required Metalyte Pipeworks to provide an online gland repack solution. Due to the gland having insufficient wall thickness, an off the shelf Injection C-Clamp was used along with working the follower to safely repack the valve leaving it fully operational.

SOLUTION

Metalyte Pipeworks repacked the gland using bespoke valve packing compounds.

REPAIR METHOD

Manufactured and installed craft repair.