MP Case History

12 inch Fire Water Deluge Skid Inlet Line

The 12” deluge fire line had suffered from internal erosion

NATURE OF DEFECT
The 12” deluge fire line had suffered from internal erosion. This resulted in a through wall leaking defect at the slip-on flange. The client requires a composite repair to seal the leak locations and to bring the line back up to a non-leaking design specification.

SOLUTION
Metalyte Pipeworks produced a repair method using their composite injectable system to seal the leaks with a minimum overwrap of 6 layers of Dragon-Q-STD composite system.

REPAIR METHOD
Metalyte Pipeworks sealed the leak using a high strength injectable composite system and the sub- strate was prepared using an MBX machine to gain a surface profile to SSP.SP11. A minimum of 2 layers of Herculyte LV resin impregnated cloth was applied as a bonding coat to the entire repair area prior to application of the Dragon composite. Once the Herculyte LV cloth was fully cured, the repair area was wrapped in 6 layers of Engineered Dragon-Q-STD composite and allowed to cure until a minimum of 74.5 “Shore D” hardness was achieved.

Recent Case Histories